• Design for all cable and wire rope types
• Virtualization
• Manufacturing BOMs
Clobbi.CableDesigner
20 - 50%
Shorter time to market achieved by leading Eastern European cable manufacturer with capacity of 100,000 Cu tons/year
5 days to 5 hours
Customer enquires answered faster
8700 Methodologies
For 160000 Cable Designs - Less time for product design and process development
20 min
For mass cable design recalculations
10 min
for customer design customization
Product Design
Process Engineering
• Manufacturing parameters
• Setup & adjustment time
• Equipment usage norms
• Waste & drum usage norms
Price & Quotation
• Cost calculations
• Direct & indirect costs
• Modelling & simulation
• Pricing and margins
Clobbi.CableDesigner – manage the basis of the future production costs and optimal production planning (Clobbi.SmartFactory)